Removing HUGE Keel Timber – Rebuilding Tally Ho EP20

Rebuilding a historic sailing yacht – Removing the Keel Timber / Bolting the Scarph. Support

Leo Sampson – This episode, I drive the 3000 miles back to Tally Ho from South Georgia, where Steve Cross has been milling Live Oak for me. I bed and bolt the 6’ Scarph in the new keel timber, and the Live Oak flitches arrive by flatbed. Then we create a framework inside to boat to spread the load of the props while I remove the Keel Timber from underneath it, all the while hoping that nothing breaks and that the boat doesn’t deform at all in shape or crush me underneath it!

Sampson Boat Co. = http://sampsonboat.co.uk/

Become a Patron, Go to : https://www.patreon.com/sampsonboatco

 

 

One Comment

  1. Incredible story. You are very brave!

Leave a Comment

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.

This site uses Akismet to reduce spam. Learn how your comment data is processed.